The Plan

Stage 1 – Assembly

Assemble all of the machines and install working, compatible operating systems. Although using Windows is a necessity on two of the machines, the rest of the Farm should run Linux as the more stable option.

Stage 2 – Confuguration

Configure File Sharing between Windows/Linux and Linux/Linux.

Stage 3 – Virtualisation

Install a virtual solution, enabling Windows to be run sufficiently to run the Render clients if no Linux version of that client can be found.

Stage 4 – Operation

Woohoo! Use the system and do some serious creation.

Leave a comment